Employer: Ender İnşaat A.Ş.
Location: Ankara
Date: 2010
The TOBB ETÜ student guesthouse is built on a 36.5-acre plot in four blocks with all the comforts for female and male students in the campus. The guesthouse has a total of 624 rooms including 572 double, 48 triple, and 4 handicapped rooms with an accommodation capacity of 1296 students.
Project Applications
LV – MV Electricity Budget: 5.555.500,19 TL
Tunnel Formwork System
LV Installation
Emergency Lighting System
Lighting Automation
Facade and Environmental Lighting System
LED Lighting
ADP and MCC Panels
Thyristor Harmonic Filter Compensation System
Busbar System
Telephone System
Head-end System
CCTV System
Data System
Fiber Optic Data System
Graphic Based Intelligent Fire
Detection and Warning System
Gas Detection and Warning System
Multichannel Regional Controlled
Digital Announcement and Music
Broadcasting System
Professional Sound System
Basic Grounding and Lightning Rod System
Snow and Ice Prevention System
Energy Supply
MV and Transformer System
Synchronous Generator System
Ups System
Access Control System
Turnstile System
Central Time System